By continuing to browse this website or by clicking 'I Accept', you agree to the use of cookies. Cookies are stored on your computer or mobile device and enhance your site experience. To learn more about how we use cookies, you can click the 'Learn More' button.
Powercrete is the result of many years of combined research by several major corporations in pipeline protection.
Available in:
2lb Kit4lb Kit10 lb Kit
Description
Powercrete® J is a solvent free epoxy polymer concrete mainline pipeline coating operating at maximum temperatures up to 60°C(140°F). Used for pipeline repairs and rehabilitation projects and other steel structures. Powercrete® J is used as the ultimate girth weld coating for FBE and CTE coated pipes.
Features
100% Solids Epoxy
no VOC
Exceeds AWWA C210 requirements
Excellent adhesion on FBE and CTE
Excellent mechanical properties
Suitable for pipeline operating temperatures to 60°C (140°F)
Exceptional adhesion and soil stress resistance on bare steel
Can be sprayed- and hand applied up to 500micron (20mils) in one multi-pass layer
Product Performance (processing under laboratory conditions)
Test Method
Typical Value
Cathodic Disbondment
ASTM G8 (25ËšC) (77ËšF) 30days
5.0 mm
ASTM G95 (60ËšC) (140ËšF) 30days
10.0 mm
Flexibility
NACE RP-0394
0.2Ëš/PD at 23ËšC/73ËšF
Impact Resistance
ASTM-G14
32in/lb/3.6Nm/3.6J at 20mils/500micron
Adhesion to FBE
ASTM D4541
>2500psi/20MPa
Adhesion to Steel
ASTM D4541
>3000psi/22MPa
Abrasion Resistance
ASTM D4060
1210 cycles a mil (48 cycles/micron)
Resistane to Acids & Alkains
ASTM C581
Excellent
Dielelctric Strength
ASTM D149
600V/mil (27V/micron)
Thin film Water Immersion
ASTM D570
0.35% (24 hours)
Hardness
ASTM D2240
85 Shore D
General Product Information
Color
Brown
Finish
Gloss
Primer
Self-priming on FBE, CTE and DTM
Dry Film Thickness
20mils (500micron) for most applications
Coverage Rate (theoretical)
81.5 sq.ft/USG at 20mils (500micron)DFT. 2,00m^2 /l at 20mils (500micron)DFT.
Volume Solids
100%
VOC Content
0 g/l
Flash Point
>200ËšC (>93ËšF) mixed product
Mixing Ratio
4:8:1 (A to B in volume) 100:11.2 (A to B by weight)
Potlife
20 minutes at 25ËšC (77ËšF)
Specifications
Curing Times at 25ËšC (77ËšF)
Gel Time:
30 minutes
Dry Time:
1.7 hours
65 Shore D:
4.2 hours (ready for holiday test)
75 Shore D:
5.2 hours (full cure)
Cure time is based on 20 mils (500 micron) DFT. Recoat interval at 21ËšC (70ËšF) is 26-83 minutes and 7-10 minutes at 65ËšC (150ËšF)
Inspection and Repair
Inspection
The finished coating must be visually inspected for any defects, such as runs and sags, fisheyes, blistering, pinholes, missed spots and possible contaminants. Pinhole/Holiday detection must generated according to NACE SP0188.
Coating Thickness
The coating thickness (DFT) must be within the specified DFT range. Use calibrated equipment and measure according to SSPC-PA 2 or other specified standard.
Repair
Pinholes/Holidays must be located and repaired with approved material. Consult Powercrete® for specific information. Retest the repaired area.
Cleaning & Handling
Cleanup
Use Acetone or MEK.
General
Transport and stacking is possible after full cure of the coating and generating a Holiday test (NACE SP0188). This time can be reduced by increasing the curing temperature. Consult Powercrete® for specific information.
General Order Information
Product
Powercrete® R-95. Product dimensions and contents:
Drum
Part A
40 gal/151.4 l
(600 lb/272.2 kg)
Part B
48 gal/181.7 l
(400 lb/181.4 kg)
Pail
Part A
5 gal/18.9 l
(75 lb/34 kg)
Part B
5 gal/18.9 l
(40 lb/18.1 kg)
Kit Options
1.32 gal/5 l
(20 lb/9.1 kg)
0.66 gal/2.5
(10 lb/4.5 kg)
0.26 gal/1 l
(4 lb/1.8 kg)
0.13 gal/0.5
(2 lb/0.9 kg)
Cartiges
On request
Handling
Handle with care. Keep containers upright.
Storage
Store indoor, clean and dry, away from direct sunlight in a cool place below 18-30°C (65- 85ËšF). Keep from freezing. Shelf life 24 months in the original unopened containers.
Additional Information
Documentation
Application instructions and other documentation can be obtained by contacting our head office, from our local distributor or by sending email to info@sealforlife.com
Certified staff
Application of the described coating system should be carried out and inspected by certified personnel.
The area to be coated has to be clean, dry and free from oil, grease and dust. All contamination that could interfere with the adhesion of the coating has to be removed according to SSPCSP1.
Preventing condensation on the subtrade
Prior and during the surface preparation, the temperature of the substrate(s) must be at least 5ËšF (3ËšC) above the dew point.
Abrasive Blasting
Minimum Sa2½ (SSPC-SP10/ NACE2) .
Recommended Surface Profile
3-4mils (75-100micron) angular profile.
Application Instruction: Surface Preperation FBE
General
The area to be coated has to be clean, dry and free from oil, grease and dust. All contamination that could interfere with the adhesion of the coating has to be removed according to SSPC-SP1.
Preventing Condensation on the substrate
Prior and during the surface preparation, the temperature of the substrate(s) must be at least 5ËšF (3ËšC) above the dew point.
Abrasive Blasting
Sa1 (SSPC-SP7/NACE4, sweep-blasting for optimum performance.
Recommended Surface Profile
Minimum 2mils (50micron) angular profile.
Application Safety
General
Read the Product Data Sheet and follow the caution statements on the Material Safety Data Sheet . Personnel who will come into contact with the product should be using appropriate protection equipment. Follow national safety guidelines.
Application Conditions
Product
Surface
Ambien
Humidity
Optimum
130ËšF (55ËšC)
70-90ËšF (21-32ËšC)
70-90ËšF (21-32ËšC)
25-50%
Minimum
122ËšF (50ËšC)
50ËšF (10ËšC)*
-20ËšF (-30ËšC)
0%
Maximum
140ËšF (60ËšC)
200ËšF (93ËšC)
120ËšF (49ËšC)
85%
* If the surface to be coated is below 10ËšC (50ËšF), preheating of the substrate is recommended. Preheat temperatures should not exceed 80ËšC (176ËšF).Prior and during the application, the temperature of the substrate must be at least 3ËšC above the dew point.
Application Instruction: Plural Component Spray
Step1
Mix the Part A and B until uniform in consistency
Step2
Use only heated plural component Airless equipment capable to maintain a 4:8:1 ratio in volume and 1.25 Gallon/4,73 Liter per minute output, with heated drums, insulated (heated) hoses and minimum 170bar (2500psi.) fluid pressure for Part A and 124bar (1800psi) for Part B. Use Binks 1M Airless spray-gun or equal with preferably changeable spray tips. Consult Powercrete® for specific information.
Step3
Part A must be heated up and maintained to a temperature of 54ËšC (130ËšF) and Part B must be heated up and maintained at 20-30ËšC (68-86ËšF).
Step4
Apply Powercrete® J in the recommended DFT. Use a WFT gauge to check. Do not dilute the product.
Description
Powercrete® J is a solvent free epoxy polymer concrete mainline pipeline coating operating at maximum temperatures up to 60°C(140°F). Used for pipeline repairs and rehabilitation projects and other steel structures. Powercrete® J is used as the ultimate girth weld coating for FBE and CTE coated pipes.
Features
100% Solids Epoxy
no VOC
Exceeds AWWA C210 requirements
Excellent adhesion on FBE and CTE
Excellent mechanical properties
Suitable for pipeline operating temperatures to 60°C (140°F)
Exceptional adhesion and soil stress resistance on bare steel
Can be sprayed- and hand applied up to 500micron (20mils) in one multi-pass layer
Product Performance (processing under laboratory conditions)
Test Method
Typical Value
Cathodic Disbondment
ASTM G8 (25ËšC) (77ËšF) 30days
5.0 mm
ASTM G95 (60ËšC) (140ËšF) 30days
10.0 mm
Flexibility
NACE RP-0394
0.2Ëš/PD at 23ËšC/73ËšF
Impact Resistance
ASTM-G14
32in/lb/3.6Nm/3.6J at 20mils/500micron
Adhesion to FBE
ASTM D4541
>2500psi/20MPa
Adhesion to Steel
ASTM D4541
>3000psi/22MPa
Abrasion Resistance
ASTM D4060
1210 cycles a mil (48 cycles/micron)
Resistane to Acids & Alkains
ASTM C581
Excellent
Dielelctric Strength
ASTM D149
600V/mil (27V/micron)
Thin film Water Immersion
ASTM D570
0.35% (24 hours)
Hardness
ASTM D2240
85 Shore D
General Product Information
Color
Brown
Finish
Gloss
Primer
Self-priming on FBE, CTE and DTM
Dry Film Thickness
20mils (500micron) for most applications
Coverage Rate (theoretical)
81.5 sq.ft/USG at 20mils (500micron)DFT. 2,00m^2 /l at 20mils (500micron)DFT.
Volume Solids
100%
VOC Content
0 g/l
Flash Point
>200ËšC (>93ËšF) mixed product
Mixing Ratio
4:8:1 (A to B in volume) 100:11.2 (A to B by weight)
Potlife
20 minutes at 25ËšC (77ËšF)
Specifications
Curing Times at 25ËšC (77ËšF)
Gel Time:
30 minutes
Dry Time:
1.7 hours
65 Shore D:
4.2 hours (ready for holiday test)
75 Shore D:
5.2 hours (full cure)
Cure time is based on 20 mils (500 micron) DFT. Recoat interval at 21ËšC (70ËšF) is 26-83 minutes and 7-10 minutes at 65ËšC (150ËšF)
Inspection and Repair
Inspection
The finished coating must be visually inspected for any defects, such as runs and sags, fisheyes, blistering, pinholes, missed spots and possible contaminants. Pinhole/Holiday detection must generated according to NACE SP0188.
Coating Thickness
The coating thickness (DFT) must be within the specified DFT range. Use calibrated equipment and measure according to SSPC-PA 2 or other specified standard.
Repair
Pinholes/Holidays must be located and repaired with approved material. Consult Powercrete® for specific information. Retest the repaired area.
Cleaning & Handling
Cleanup
Use Acetone or MEK.
General
Transport and stacking is possible after full cure of the coating and generating a Holiday test (NACE SP0188). This time can be reduced by increasing the curing temperature. Consult Powercrete® for specific information.
General Order Information
Product
Powercrete® R-95. Product dimensions and contents:
Drum
Part A
40 gal/151.4 l
(600 lb/272.2 kg)
Part B
48 gal/181.7 l
(400 lb/181.4 kg)
Pail
Part A
5 gal/18.9 l
(75 lb/34 kg)
Part B
5 gal/18.9 l
(40 lb/18.1 kg)
Kit Options
1.32 gal/5 l
(20 lb/9.1 kg)
0.66 gal/2.5
(10 lb/4.5 kg)
0.26 gal/1 l
(4 lb/1.8 kg)
0.13 gal/0.5
(2 lb/0.9 kg)
Cartiges
On request
Handling
Handle with care. Keep containers upright.
Storage
Store indoor, clean and dry, away from direct sunlight in a cool place below 18-30°C (65- 85ËšF). Keep from freezing. Shelf life 24 months in the original unopened containers.
Additional Information
Documentation
Application instructions and other documentation can be obtained by contacting our head office, from our local distributor or by sending email to info@sealforlife.com
Certified staff
Application of the described coating system should be carried out and inspected by certified personnel.
The area to be coated has to be clean, dry and free from oil, grease and dust. All contamination that could interfere with the adhesion of the coating has to be removed according to SSPCSP1.
Preventing condensation on the subtrade
Prior and during the surface preparation, the temperature of the substrate(s) must be at least 5ËšF (3ËšC) above the dew point.
Abrasive Blasting
Minimum Sa2½ (SSPC-SP10/ NACE2) .
Recommended Surface Profile
3-4mils (75-100micron) angular profile.
Application Instruction: Surface Preperation FBE
General
The area to be coated has to be clean, dry and free from oil, grease and dust. All contamination that could interfere with the adhesion of the coating has to be removed according to SSPC-SP1.
Preventing Condensation on the substrate
Prior and during the surface preparation, the temperature of the substrate(s) must be at least 5ËšF (3ËšC) above the dew point.
Abrasive Blasting
Sa1 (SSPC-SP7/NACE4, sweep-blasting for optimum performance.
Recommended Surface Profile
Minimum 2mils (50micron) angular profile.
Application Safety
General
Read the Product Data Sheet and follow the caution statements on the Material Safety Data Sheet . Personnel who will come into contact with the product should be using appropriate protection equipment. Follow national safety guidelines.
Application Conditions
Product
Surface
Ambien
Humidity
Optimum
130ËšF (55ËšC)
70-90ËšF (21-32ËšC)
70-90ËšF (21-32ËšC)
25-50%
Minimum
122ËšF (50ËšC)
50ËšF (10ËšC)*
-20ËšF (-30ËšC)
0%
Maximum
140ËšF (60ËšC)
200ËšF (93ËšC)
120ËšF (49ËšC)
85%
* If the surface to be coated is below 10ËšC (50ËšF), preheating of the substrate is recommended. Preheat temperatures should not exceed 80ËšC (176ËšF).Prior and during the application, the temperature of the substrate must be at least 3ËšC above the dew point.
Application Instruction: Plural Component Spray
Step1
Mix the Part A and B until uniform in consistency
Step2
Use only heated plural component Airless equipment capable to maintain a 4:8:1 ratio in volume and 1.25 Gallon/4,73 Liter per minute output, with heated drums, insulated (heated) hoses and minimum 170bar (2500psi.) fluid pressure for Part A and 124bar (1800psi) for Part B. Use Binks 1M Airless spray-gun or equal with preferably changeable spray tips. Consult Powercrete® for specific information.
Step3
Part A must be heated up and maintained to a temperature of 54ËšC (130ËšF) and Part B must be heated up and maintained at 20-30ËšC (68-86ËšF).
Step4
Apply Powercrete® J in the recommended DFT. Use a WFT gauge to check. Do not dilute the product.
Are you sure you would like to remove this item from the shopping cart?
This item is a part of the approved quote. Removing it will remove all quote items from the cart.