Protal 7125 by Denso

Fast Cure, Low Temperature Pipeline Coating Available in: 825ml Repair Cartridge0.8 Liter Kit1.5 Liter Kit
  • Technical Data

     Description

    Denso Protal 7125 is specifically formulated to be applied to colder substrates at colder ambient temperatures. It is a high build liquid coating that is hand applied in one coat to many areas of in-service pipelines or during pipeline construction in the field or shop. It cures fast to allow quick handling and backfilling, even down to -4°F (-20°C). Protal 7125 is intended for use where a quick cure is required at lower substrate and/or ambient conditions such as during winter applications or on colder operating temperature pipelines. It will also cure after being submersed in water.

     Uses

    Used as a rehabilitation coating for existing low temperature in-service operating pipelines, station piping, girth welds, tie-ins, push rack (laybarge applications), abrasion resistant coating for boring applications, repairs to FBE, fittings and fabrication. It may also be used for new construction where colder temperatures exist and preheating or post heating is not practical or feasible.

     Features

    • Cold temperature application down to -4°F (-20°C)
    • Will not freeze
    • Fast cure, fast initial set
    • Will cure when submersed in water
    • High build (in one coat)
    • Excellent adhesion (compliments FBE coated pipe)
    • High abrasion resistance for drilling applications
    • Does not shield cathodic protection
    • Repair cartridges available

     Application

    Prepare surfaces by grit blasting to a clean near white finish, SSC-SP 10/ NACE No. 2. (Repair areas shall be roughened using Carborundum cloth or 80 grit sandpaper and wiped clean with an isopropyl alcohol soaked cloth prior to patching.) Open container to prepare for mixing and remove both foil pouches. Cut open larger foil pouch, Part “A” and empty the white contents into mixing container, then cut open and add the smaller foil pouch, Part “B”. Thoroughly mix both components to a consistent gray color using a wooden stick or power mixer. During the mixing process, the inside surface of the container should be scraped to obtain a complete mixture. Pour mixed material onto surface and brush, trowel or roll to required thickness. A wet film thickness gauge shall be used to measure mil thickness (min. 20 mils). Backfilling times are dependent on temperature and will be extended at cooler temperatures. Note: Denso recommends surface temperature during application to be a maximum of 68°F (20°C) for optimum performance characteristics.

     Packaging

    1 liter kits and 825 ml repair cartridges.

     Storage

    Minimum 6 months when stored in original containers above 40°F (4°C). Product will not freeze.

     Cleaning

    Clean equipment with solvent cleaner (xylene 95%, butanol 5%) or approved solvent.

     Safety

    Spray or brush under well ventilated conditions. Wear suitable protective clothing and glasses. See:
    MSDS for Protal 7125 "A"
    MSDS for Protal  7125 "B"

     


  • Technical Data

    PropertiesData

    Percent Reactive

    100%

    Base Component - unmixed at 77°F (25°C)
         Specific Gravity
         Viscosity
         Color


    1.54
    Thixotropic liquid
    White

    Hardener - unmixed at 77°F (25°C)
         Specific Gravity
         Viscosity
         Color


    1.48
    Soft paste
    Black

    Mixed Material - mixed at 77°F (25°C)
         Specific Gravity
         Viscosity
         Color


    1.46
    Thixotropic liquid
    Gray

    Mixing Ratio
         By Volume


    10 parts base, 1 part hardener

    Gel Time / Pot Life - 1 Liter Kit
         Material @ 68°F (20°C)
         Material @ 50°F (10°C)
         Material @ 32°F (0°C)
         Material @ 14°F (-10°C)


    10 Minutes
    18 Minutes
    30 Minutes
    45 Minutes

    Back Fill Times - Material at 50°F (10°C)
         Ambient & Substrate Temp. @ 68°F (20°C)
         Ambient & Substrate Temp. @ 50°F (10°C)
         Ambient & Substrate Temp. @ 32°F (0°C)
         Ambient & Substrate Temp. @ 14°F (-10°C)


    20 - 30 Minutes
    45 - 60 Minutes
    2 Hours
    3 - 4 Hours

    Theoretical Coverage

      14 ft2 (1.3 m2) / liter for 30 mils film build

    Thickness
        
    Minimum
         Recommended

      
    20 mils
    25-30 mils

    Holiday Detection

    2,000 volts maximum

    Cathodic Disbondment Test
         28 Days @ 68°F (20°C)


    7.1 mm

    Adhesion to Steel

    2400 psi

    Hardness

    85 per Shore D

    Gouge Resistance

    3 passes = 0 Fail @ 50 kg

    Application Temperature

    -4°F to 68°F (-20°C to 20°C).

    Service Temperature

    -40°F to 150°F (-40°C to 65°C)