Newsletter

Farwest Current July 2025

Loading...
| 33 view(s)

We’re excited to announce the recent launch of the new FarwestCorrosion.com—redesigned for speed, simplicity and better access to the information and products our customers rely on.

Farwest Current March 2025

Loading...
| 7 view(s)

This new division offers comprehensive services, including water tank system design, testing, troubleshooting, repairs and monitoring. We also provide turnkey cathodic protection (CP) installations for water tanks and hold NSF/ANSI 61 certification, ensuring our solutions meet stringent health and safety standards.​

Farwest Current - June 2024

Loading...
| 12 view(s)

Are you familiar with the Farwest DCPro Power Supply? With hundreds already in use, the DCPro is proven to perform efficiently and effectively in diverse settings. Customers appreciate its standard features and are happy with its ability to maintain the needed output current.

 

Interested in learning more? Watch our video, download our product brochure here or contact a Farwest technical representative today!

Beneath the Surface Introduction

Loading...
| 11 view(s)

We’re thrilled to announce the launch of "Beneath the Surface," Farwest Corrosion Control's ebook designed to provide you with tips and insights to combat corrosion.

Why You Can't Miss "Beneath the Surface":

- Deep Insights: Leverage nearly seven decades of Farwest’s expertise distilled into a users guide.

- Actionable Solutions: Discover practical solutions for safeguarding your assets from corrosion.

- Practical Techniques: Stay ahead with approaches to corrosion control and cathodic protection employed by Farwest experts.

Farwest Current November 2023

Loading...
| 4 view(s)

During a typical cathodic protection (CP) field survey, the CP technician must make effective electrical connections to the structure under test and other metallic components.  

Often, the technician will encounter an existing above-ground test station where a conductor (cable) is permanently attached to the structure under test and the other end is terminated to the test station panel. In this case, the connection to the structure is already made and is typically effective. 

Farwest Current August 2023

Loading...
| 3 view(s)

Farwest Current March 2023

Loading...
| 1 view(s)

Farwest Current November 2022

Loading...
| 2 view(s)

Farwest Current April 2022

Loading...
| 3 view(s)